40x60 Concrete Slab Cost
A 40 ft × 60 ft concrete slab is 2400 square feet. At a standard 4-inch thickness it needs about 32.59 cubic yards of concrete (with 10 % waste) and costs roughly $14,400 – $31,200 installed with a plain broom finish.
Need different dimensions? Use the full Slab Cost Calculator for a custom estimate.
Material & Cost Breakdown
| Metric | Value | Notes |
|---|---|---|
| Square footage | 2400 sq ft | 40 ft × 60 ft |
| Thickness | 4 in | Standard residential |
| Concrete volume | 29.63 yd³ | Before waste |
| Order volume (10% waste) | 32.59 yd³ | Ready-mix ordering target |
| 80 lb bags needed | 1467 bags | Including waste |
| 60 lb bags needed | 1956 bags | Including waste |
| Ready-mix material cost | $4,237 – $5,378 | ~$130–$165 per yard delivered |
| Installed cost (broom) | $14,400 – $31,200 | $6–$13 per sq ft |
* Installed cost assumes a standard broom finish, easy site access, and a prepared sub-base. Decorative finishes, tear-out, poor soil, or pump-truck access will move the price higher.
40x60 Slab Cost by Thickness
Thickness is the single biggest lever on how much concrete a 40x60 slab needs. A 4-inch pour suits patios and light foot traffic; step up to 5–6 inches for driveways, garages, shops, and anything carrying vehicles or heavy equipment. Each extra inch adds concrete volume and a little labor.
| Thickness | Concrete (10% waste) | Installed cost | Typical use |
|---|---|---|---|
| 4 in (standard) | 32.59 yd³ | $14,400 – $31,200 | Patios, walkways, light foot traffic |
| 5 in | 40.74 yd³ | $15,840 – $32,640 | Driveways, standard garages |
| 6 in | 48.89 yd³ | $17,280 – $34,080 | Shops, RV pads, heavy equipment |
How We Calculated It
- Area: 40 ft × 60 ft = 2400 sq ft
- Volume: 2400 sq ft × (4 in ÷ 12) = 800.0 cu ft ÷ 27 = 29.63 yd³
- With 10% waste: 29.63 × 1.10 = 32.59 yd³
- Bags (80 lb): 32.59 × 27 ÷ 0.60 cu ft/bag ≈ 1467 bags
FAQs
How much does a 40x60 concrete slab cost?
A 40x60 (2400 sq ft) concrete slab costs roughly $14,400 to $31,200 installed with a broom finish in 2026. Decorative finishes, tear-out, and site prep can raise the price.
How many cubic yards for a 40x60 slab?
At 4 inches thick, a 40x60 slab needs about 29.63 cubic yards before waste and 32.59 yards after a 10% ordering allowance.
How many 80 lb bags for a 40x60 slab?
You would need about 1467 bags of 80 lb concrete (including 10% waste). Above roughly one cubic yard, ready-mix is usually cheaper and easier than bags.
How much does a 40x60 slab cost at 6 inches thick?
A 6-inch 40x60 slab needs about 48.89 cubic yards of concrete and typically runs $17,280 to $34,080 installed. The thicker pour adds concrete volume, so it costs more than the standard 4-inch slab but resists cracking under vehicles and heavy loads.
Planning Your 40x60 Pour
When preparing to pour a 40 ft × 60 ft concrete slab, proper planning is essential to keep your project on budget. The dimensions directly determine the total square footage, which in turn dictates the amount of labor, forming materials, and finishing time required.
The thickness is equally important. While 4 inches is standard for this type of slab, increasing the thickness by just one inch will significantly increase the total cubic yards of concrete needed. Always ensure your sub-base is properly compacted and leveled; an uneven base can lead to thick spots that consume more concrete than your initial estimate predicted. Lastly, ordering with a 10% waste margin is a standard industry practice to account for minor spills, uneven ground, and the small amount of concrete left inside the delivery truck.