Slab cost estimate
24x30 Concrete Slab Cost
A 24 ft × 30 ft concrete slab is 720 square feet. At a standard 4-inch thickness it needs about 9.78 cubic yards of concrete (with 10 % waste) and costs roughly $4,320 – $9,360 installed with a plain broom finish.
Need different dimensions? Use the full Slab Cost Calculator for a custom estimate.
Material & Cost Breakdown
| Metric | Value | Notes |
|---|---|---|
| Square footage | 720 sq ft | 24 ft × 30 ft |
| Thickness | 4 in | Standard residential |
| Concrete volume | 8.89 yd³ | Before waste |
| Order volume (10% waste) | 9.78 yd³ | Ready-mix ordering target |
| 80 lb bags needed | 440 bags | Including waste |
| 60 lb bags needed | 587 bags | Including waste |
| Ready-mix material cost | $1,271 – $1,613 | ~$130–$165 per yard delivered |
| Installed cost (broom) | $4,320 – $9,360 | $6–$13 per sq ft |
* Installed cost assumes a standard broom finish, easy site access, and a prepared sub-base. Decorative finishes, tear-out, poor soil, or pump-truck access will move the price higher.
24x30 Slab Cost by Thickness
Thickness is the single biggest lever on how much concrete a 24x30 slab needs. A 4-inch pour suits patios and light foot traffic; step up to 5–6 inches for driveways, garages, shops, and anything carrying vehicles or heavy equipment. Each extra inch adds concrete volume and a little labor.
| Thickness | Concrete (10% waste) | Installed cost | Typical use |
|---|---|---|---|
| 4 in (standard) | 9.78 yd³ | $4,320 – $9,360 | Patios, walkways, light foot traffic |
| 5 in | 12.22 yd³ | $4,752 – $9,792 | Driveways, standard garages |
| 6 in | 14.67 yd³ | $5,184 – $10,224 | Shops, RV pads, heavy equipment |
How We Calculated It
- Area: 24 ft × 30 ft = 720 sq ft
- Volume: 720 sq ft × (4 in ÷ 12) = 240.0 cu ft ÷ 27 = 8.89 yd³
- With 10% waste: 8.89 × 1.10 = 9.78 yd³
- Bags (80 lb): 9.78 × 27 ÷ 0.60 cu ft/bag ≈ 440 bags
FAQs
How much does a 24x30 concrete slab cost?
A 24x30 (720 sq ft) concrete slab costs roughly $4,320 to $9,360 installed with a broom finish in 2026. Decorative finishes, tear-out, and site prep can raise the price.
How many cubic yards for a 24x30 slab?
At 4 inches thick, a 24x30 slab needs about 8.89 cubic yards before waste and 9.78 yards after a 10% ordering allowance.
How many 80 lb bags for a 24x30 slab?
You would need about 440 bags of 80 lb concrete (including 10% waste). Above roughly one cubic yard, ready-mix is usually cheaper and easier than bags.
How much does a 24x30 slab cost at 6 inches thick?
A 6-inch 24x30 slab needs about 14.67 cubic yards of concrete and typically runs $5,184 to $10,224 installed. The thicker pour adds concrete volume, so it costs more than the standard 4-inch slab but resists cracking under vehicles and heavy loads.
Planning Your 24x30 Pour
When preparing to pour a 24 ft × 30 ft concrete slab, proper planning is essential to keep your project on budget. The dimensions directly determine the total square footage, which in turn dictates the amount of labor, forming materials, and finishing time required.
The thickness is equally important. While 4 inches is standard for this type of slab, increasing the thickness by just one inch will significantly increase the total cubic yards of concrete needed. Always ensure your sub-base is properly compacted and leveled; an uneven base can lead to thick spots that consume more concrete than your initial estimate predicted. Lastly, ordering with a 10% waste margin is a standard industry practice to account for minor spills, uneven ground, and the small amount of concrete left inside the delivery truck.