Patio cost estimate
12x20 Concrete Patio Cost
A 12 ft × 20 ft concrete patio is 240 square feet. At a standard 4-inch thickness it needs about 3.26 cubic yards of concrete (with 10 % waste) and costs roughly $1,440 – $2,880 installed with a plain broom finish.
Need different dimensions? Use the full Patio Cost Calculator for a custom estimate.
Material & Cost Breakdown
| Metric | Value | Notes |
|---|---|---|
| Square footage | 240 sq ft | 12 ft × 20 ft |
| Thickness | 4 in | Standard residential |
| Concrete volume | 2.96 yd³ | Before waste |
| Order volume (10% waste) | 3.26 yd³ | Ready-mix ordering target |
| 80 lb bags needed | 147 bags | Including waste |
| 60 lb bags needed | 196 bags | Including waste |
| Ready-mix material cost | $424 – $538 | ~$130–$165 per yard delivered |
| Installed cost (broom) | $1,440 – $2,880 | $6–$12 per sq ft |
* Installed cost assumes a standard broom finish, easy site access, and a prepared sub-base. Decorative finishes, tear-out, poor soil, or pump-truck access will move the price higher.
How We Calculated It
- Area: 12 ft × 20 ft = 240 sq ft
- Volume: 240 sq ft × (4 in ÷ 12) = 80.0 cu ft ÷ 27 = 2.96 yd³
- With 10% waste: 2.96 × 1.10 = 3.26 yd³
- Bags (80 lb): 3.26 × 27 ÷ 0.60 cu ft/bag ≈ 147 bags
FAQs
How much does a 12x20 concrete patio cost?
A 12x20 (240 sq ft) concrete patio costs roughly $1,440 to $2,880 installed with a broom finish in 2026. Decorative finishes, tear-out, and site prep can raise the price.
How many cubic yards for a 12x20 patio?
At 4 inches thick, a 12x20 patio needs about 2.96 cubic yards before waste and 3.26 yards after a 10% ordering allowance.
How many 80 lb bags for a 12x20 patio?
You would need about 147 bags of 80 lb concrete (including 10% waste). Above roughly one cubic yard, ready-mix is usually cheaper and easier than bags.
Planning Your 12x20 Pour
When preparing to pour a 12 ft × 20 ft concrete patio, proper planning is essential to keep your project on budget. The dimensions directly determine the total square footage, which in turn dictates the amount of labor, forming materials, and finishing time required.
The thickness is equally important. While 4 inches is standard for this type of patio, increasing the thickness by just one inch will significantly increase the total cubic yards of concrete needed. Always ensure your sub-base is properly compacted and leveled; an uneven base can lead to thick spots that consume more concrete than your initial estimate predicted. Lastly, ordering with a 10% waste margin is a standard industry practice to account for minor spills, uneven ground, and the small amount of concrete left inside the delivery truck.