Concrete removal costs about $2 to $6 per square foot for a plain unreinforced slab and $4 to $9 per square foot when the concrete is reinforced with rebar or wire mesh. Saw cutting clean edges adds $3 to $8 per linear foot. Most of the cost is labor, equipment, and the weight-based disposal fee — not the demolition itself.
This guide covers what drives removal pricing and when DIY makes sense. If you are replacing a driveway or patio, the driveway calculator includes a tear-out option so you can budget removal and the new pour together.
Need project-specific numbers? Use the Concrete Removal Cost Calculator.
Last updated June 10, 2026
Typical Cost Ranges
| Item | Typical Cost | Notes |
|---|---|---|
| Plain slab removal | $2-$6/sq ft | Common driveway and patio tear-out |
| Reinforced slab removal | $4-$9/sq ft | Rebar or wire mesh adds labor |
| Saw cutting | $3-$8/linear ft | Needed for clean replacement edges |
What Drives the Cost
- Thickness and reinforcement: Thicker and rebar-reinforced slabs break up slower and produce heavier debris, raising both labor and disposal cost.
- Disposal fees: Concrete is heavy and dump fees are weight-based; hauling is often the largest line on a removal quote.
- Access: Tight backyards with no equipment access force hand demolition and wheelbarrowing, which is slower and more expensive.
- Saw cutting: Clean, straight edges for a partial replacement require saw cutting, billed per linear foot.
- Condition: Already-broken or crumbling concrete is faster to remove than a sound, intact slab.
How To Estimate It
- Removal cost = square feet x removal rate + disposal minimums
Can you remove concrete yourself?
Small, thin, unreinforced sections can be a realistic DIY job with a sledgehammer or a rented electric breaker. The hidden costs are the disposal — concrete is extremely heavy and most landfills charge by weight — plus tool rental, dust control, and the physical toll.
For thick, reinforced, or large slabs, a contractor with the right equipment is usually worth the price. Many haul-away and disposal services also have minimum charges that make small DIY loads less economical than they first appear.
Do you have to remove old concrete before pouring new?
For a durable replacement, usually yes — especially if the old slab is cracked, settled, too thin, or poorly drained, since those problems will telegraph through anything poured on top. In limited cases a sound slab can be used as a base for an overlay, but pouring new concrete over a failing slab typically just repeats the failure.
FAQs
Can I remove concrete myself?
Small unreinforced sections can be DIY, but hauling, disposal weight, dust, and tool rental often make contractor removal worth pricing.
Does old concrete need to be removed before a new driveway?
Usually yes for a durable replacement, especially if the old slab is cracked, settled, too thin, or poorly drained.
How much does it cost to remove a concrete driveway?
Typically $2 to $6 per square foot for a plain slab and $4 to $9 if it is reinforced, plus saw cutting and disposal fees.
Why is concrete disposal so expensive?
Concrete is dense and heavy, and most disposal sites charge by weight, so hauling a slab away can cost as much as breaking it up.
Is reinforced concrete harder to remove?
Yes. Rebar and wire mesh hold broken pieces together and must be cut out, which adds labor and pushes removal toward the higher per-foot range.